Martin Energy Group and Martin Construction Resource knew there was a better Digester. The problem, it had not been designed yet.
By working as a united team we were able to Design and Build.
Why the EM-21 stands out above the rest
- In-ground – safe, easy maintenance and clean out
- Cleanout without removing the cover!
- Enables easy crust control if needed
- Easily change mixer props with through roof hatches
- Flexible, double-membrane cover
- Proven heating coil system – no external heating years later
Example of a 1.52M Gallon Tank
-
Performance
-
Maintenance
-
Safety
-
Cost Effectiveness